Total Alkalinity
[_____]
epm (meq/1)
[_____]
epm (meq/1)
[_____]
epm (meq/1)
Dissolved Solids
[_____]
ppm (mg/1)
[_____]
ppm (mg/1)
[_____]
micro-mho/cm
If the boiler water is not in conformance with the boiler manufacturer's
recommendations, the water treatment company shall take corrective action.
3.8.2
Boiler/Piping Test
**************************************************************************
NOTE: If a steam boiler is not used, delete the
reference to condensate piping.
**************************************************************************
At the conclusion of the 1 year period, the boiler and condensate piping
shall be inspected for problems due to corrosion and scale. If the boiler
is found not to conform to the manufacturer's recommendations, and the
water treatment company recommendations have been followed, the water
treatment company shall provide all chemicals and labor for cleaning or
repairing the equipment as required by the manufacturer's recommendations.
If corrosion is found within the condensate piping, proper repairs shall be
made by the water treatment company.
3.9
CLEANING
3.9.1
balanced and operating tests are performed, the boilers and feed water
piping shall be thoroughly cleaned by filling the system with a solution
consisting of either 0.5 kg 1 pound of caustic soda or 0.5 kg 1 pound of
trisodium phosphate per 190 L 50 gallons of water. The proper safety
precautions shall be observed in the handling and use of these chemicals.
The water shall be heated to approximately 65 degrees C 150 degrees F and
the solution circulated in the system for a period of 48 hours. The system
shall then be drained and thoroughly flushed out with fresh water.
Strainers and valves shall be thoroughly cleaned. Prior to operating
tests, air shall be removed from all water systems by operating the air
vents.
3.9.2
Inside space heating equipment, ducts, plenums, and casing shall be
thoroughly cleaned of debris and blown free of small particles of rubbish
and dust and then vacuum cleaned before installing outlet faces. Equipment
shall be wiped clean, with all traces of oil, dust, dirt, or paint spots
removed. Temporary filters shall be provided for fans that are operated
during construction, and new filters shall be installed after construction
dirt has been removed from the building, and the ducts, plenum, casings,
and other items specified have been vacuum cleaned. System shall be
maintained in this clean condition until final acceptance. Bearings shall
be properly lubricated with oil or grease as recommended by the
manufacturer. Belts shall be tightened to proper tension. Control valves
and other miscellaneous equipment requiring adjustment shall be adjusted to
setting indicated or directed. Fans shall be adjusted to the speed
indicated by the manufacturer to meet specified conditions.
SECTION 15569A