blowdown.] [automatic blowdown based upon conductivity or boiler load.] The
required rate of chemical feed and boiler blowdown shall be determined by
the water treatment company.
2.16.10
Chemical Shot Feeder
A shot feeder shall be provided as indicated. Size and capacity of feeder
shall be based upon local requirements and water analysis. The feeder
shall be furnished with an air vent, gauge glass, funnel, valves, fittings,
and piping.
2.16.11
Chemical Piping
**************************************************************************
NOTE: If steel piping is selected, an interior
coating may be required depending upon the chemicals
used.
**************************************************************************
The piping and fittings shall be constructed of [schedule 80 PVC] [steel]
[stainless steel].
2.16.12
Test Kits
One test kit of each type required to determine the water quality as
PART 3
EXECUTION
3.1
ERECTION OF BOILER AND AUXILIARY EQUIPMENT
**************************************************************************
NOTE: Consult boiler manufacturers for foundation
requirements. Delete the requirement for packing
the joint between the boiler and floor with
nonasbestos rope, if not required. This packing is
typically not required for smaller units.
**************************************************************************
manufacturer's written instructions. Proper provision shall be made for
expansion and contraction between boiler foundation and floor. This joint
shall be packed with suitable nonasbestos rope and filled with suitable
compound that will not become soft at a temperature of 40 degrees C 100
foundations by structural steel completely independent of all brickwork.
Boiler supports shall permit free expansion and contraction of each portion
of the boiler without placing undue stress on any part of the boiler or
setting. Boiler breeching shall be as indicated with full provision for
expansion and contraction between all interconnected components.
3.2
PIPING INSTALLATION
Unless otherwise specified, nonboiler external pipe and fittings shall
conform to the requirements of ASME B31.1. Pipe installed shall be cut
accurately to suit field conditions, shall be installed without springing
or forcing, and shall properly clear windows, doors, and other openings.
Cutting or other weakening of the building structure to facilitate piping
installation will not be permitted. Pipes shall be free of burrs, oil,
SECTION 15569A
Page 61