2.1.1
Boiler Connections
Requirements for interconnecting piping, insulation, fuel supply,
[vibration isolation,] [_____,] and other related work necessary to provide
a complete and operable steam system, whether or not specifically mentioned
above, shall conform to applicable requirements of other sections of
Division 15.
2.1.2
In addition to the instruments required by the boiler specifications
referenced above, provide the following instruments and locate where shown
and where recommended by instrument manufacturer:
a.
A flue gas temperature gage.
b. A draft gage, [single point] [two point], conforming to
ASME B40.1.
**************************************************************************
NOTE: Select the applicable paragraph(s) from the
following:
**************************************************************************
**************************************************************************
NOTE: These instruments are not normally required
on boilers under 2930 kW 10,000,000 Btu/h.
**************************************************************************
[c.
A carbon dioxide recorder to measure, record, and indicate the
Flush mount the recording unit and furnish with locking device and
conform to MIL-M-29190.]
**************************************************************************
NOTE: These instruments are not normally required
on boilers under 2930 kW 10,000,000 Btu/h.
**************************************************************************
[c.
flue gases generated by combustion of [gas] [or] [oil] as
specified in paragraph entitled "Boilers" shall be provided for
each boiler. The output of the analyzer shall range from zero to
[_____] [25] percent oxygen:
(1) Provide a complete aspirating system with proper connection
to stack, necessary steam or water aspirating facilities, and
piping of proper specification to analyzer. Provide piping in
and install tight. Install equipment in accordance with the
manufacturer's instructions.
(2) Provide a paramagnetic analyzer. Analyzer shall provide
oxygen analysis in the zero and 25 percent oxygen range, and have
means of calibration. Provide zero range and span adjustments as
required.
SECTION 15516N