servicing of the equipment and make any adjustments necessary to insure
full compliance with design criteria.
3.7
CLEANING AND ADJUSTING
Equipment shall be wiped clean, with all traces of oil, dust, dirt, or
paint spots removed. Temporary filters shall be provided for all fans that
are operated during construction, and new filters shall be installed after
all construction dirt has been removed from the building. System shall be
maintained in this clean condition until final acceptance. Bearings shall
be properly lubricated with oil or grease as recommended by the
manufacturer. Belts shall be tightened to proper tension. Control valves
and other miscellaneous equipment requiring adjustment shall be adjusted to
the setting indicated or directed. Fans shall be adjusted to the speed
indicated by the manufacturer to meet specified conditions.
3.8
DEMONSTRATIONS
Contractor shall conduct a training course for the operating staff as
designated by the Contracting Officer. The training period shall consist
of a total [_____] hours of normal working time and start after the system
is functionally completed but prior to final acceptance tests. The field
instructions shall cover all of the items contained in the Operation and
operations.
-- End of Section --
SECTION 15500A
Page 26