UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated 23 June 2005
**************************************************************************
SECTION 15213N
09/99
**************************************************************************
NOTE: This guide specification covers the
requirements for large centrifugal air compressors
over 150 kW 200 hp and certain accessories.
Comments and suggestions on this guide specification
are welcome and should be directed to the technical
proponent of the specification. A listing of
technical proponents, including their organization
designation and telephone number, is on the Internet.
Recommended changes to a UFGS should be submitted as
a Criteria Change Request (CCR).
Use of electronic communication is encouraged.
Brackets are used in the text to indicate designer
choices or locations where text must be supplied by
the designer.
**************************************************************************
**************************************************************************
cooling water piping, and other items are not
included and must be included in other sections of
the project specification. CENTRIFUGAL COMPRESSORS
MUST BE PERMITTED AS AN OPTION IF NONLUBRICATED
PROJECT.
**************************************************************************
**************************************************************************
NOTE: The following information shall be shown on
1. Compressor, accessory equipment, and piping
arrangement and details.
2.
Equipment foundations.
3. Equipment schedules. If equipment schedules
include operating conditions for the compressor,