Contracting Officer shall be notified 24 hours in advance of tests and the
tests shall be performed at the work site if practical. The welder or
welding operator shall apply the personally assigned symbol near each weld
made, as a permanent record. Structural members shall be welded in
accordance with Section [05090A WELDING, STRUCTURAL] [05120 STRUCTURAL
STEEL].] [Welding and nondestructive testing procedures are specified in
Section [05093 WELDING PRESSURE PIPING] [15216N WELDING PRESSURE PIPING].]
1.4
SAFETY REQUIREMENTS
Exposed moving parts, parts that produce high operating temperature, parts
which may be electrically energized, and parts that may be a hazard to
operating personnel shall be insulated, fully enclosed, guarded, or fitted
with other types of safety devices. Safety devices shall be installed so
safety requirements shall be in accordance with AWS Z49.1.
1.5
DELIVERY, STORAGE, AND HANDLING
Stored items shall be protected from the weather, humidity and temperature
variations, dirt and dust, or other contaminants. Proper protection and
care of all material both before and during installation shall be the
Contractor's responsibility. Any materials found to be damaged shall be
replaced at the Contractor's expense. During installation, piping and
similar openings shall be capped to keep out dirt and other foreign matter.
1.6
PROJECT/SITE CONDITIONS
1.6.1
Verification of Dimensions
The Contractor shall become familiar with all details of the work, verify
all dimensions in the field, and advise the Contracting Officer of any
discrepancy before performing any work.
1.6.2
Contract Drawings
Because of the small scale of the drawings, it is not possible to indicate
all offsets, fittings, and accessories that may be required. The
Contractor shall carefully investigate the plumbing, fire protection,
electrical, structural and finish conditions that would affect the work to
be performed and shall arrange such work accordingly, furnishing required
offsets, fittings, and accessories to meet such conditions.
1.6.3
Spare Parts
**************************************************************************
NOTE: Remove this paragraph in Navy projects.
**************************************************************************
The Contractor shall submit spare parts data for each different item of
[_____] months prior to the date of beneficial occupancy. The data shall
include a complete list of parts and supplies, with current unit prices and
source of supply, a recommended spare parts list for 1 year of operation,
and a list of the parts recommended by the manufacturer to be replaced on a
routine basis.
SECTION 15182