[Six] [_____] copies of the report shall be provided in bound
216 x 279 mm (8 1/2 x 11 inch) 8 1/2 x 11 inch booklets. Reports
shall document all phases of the tests performed. The report
shall include initial test summaries, all repairs/adjustments
made, and the final test results.
SD-07 Certificates
Service Organization[; G][; G, [_____]]
A certified list of qualified permanent service organizations
for support of the equipment which includes their addresses and
qualifications. The service organizations shall be reasonably
convenient to the equipment installation and be able to render
satisfactory service to the equipment on a regular and emergency
basis during the warranty period of the contract.
SD-10 Operation and Maintenance Data
Maintenance
Data Package 2 in accordance with Section 01781 OPERATION AND
MAINTENANCE DATA.
[Six] [_____] complete copies of an operation manual in bound
216 x 279 (81/2 x 11 inch) 8 1/2 x 11 inch booklets listing
step-by-step procedures required for system startup, operation,
abnormal shutdown, emergency shutdown, and normal shutdown at
least [4] [_____] weeks prior to the first training course. The
booklets shall include the manufacturer's name, model number, and
parts list. The manuals shall include the manufacturer's name,
model number, service manual, and a brief description of all
equipment and their basic operating features.
[Six] [_____] complete copies of maintenance manual in bound 216
x 279 (81/2 x 11 inch) 8 1/2 x 11 inch booklets listing routine
maintenance procedures, possible breakdowns and repairs, and a
trouble shooting guide. The manuals shall include piping layouts
and simplified wiring and control diagrams of the system as
installed.
1.3
QUALIFICATIONS
**************************************************************************
NOTE: If the need exists for more stringent
requirements for weldments, delete the first
bracketed statement, otherwise delete the second.
Regarding welding Section reference, use first
bracketed statement for Army projects and delete the
second option of the Navy Section; and vice versa.
**************************************************************************
[Piping shall be welded in accordance with the qualified procedures using
performance qualified welders and welding operators. Procedures and
welders shall be qualified in accordance with ASME BPVC SEC IX. Welding
procedures qualified by others, and welders and welding operators qualified
by another employer may be accepted as permitted by ASME B31.1. The
SECTION 15182
Page 9