the project site. The pump and associated equipment shall be stored
indoors as recommended by the pump manufacturer, protected from
construction or weather hazards at the project site. The pump and
equipment shall have adequate short-term storage in a covered, dry, and
ventilated location prior to installation. The manufacturer's instructions
shall be followed for extended storage. Proper equipment for handling the
pump shall be supplied and shall be considered as special tools if not
completely standard.
1.7
SPECIAL TOOLS
Furnish one set of all special tools
required to completely assemble,
disassemble, or maintain the pumps.
Special tools refers to oversized or
specially dimensioned tools, special
attachment or fixtures, or any similar
items. Lifting devices required for
use in conjunction with the [overhead]
[truck] crane shall be furnished.
1.8
INSTALLATION AND START-UP ENGINEER
The Contractor shall furnish a competent installation engineer fluent in
the English language who is knowledgeable and experienced with the
installation and start-up procedures for submersible pumps and the
associated equipment specified. Installation/erecting engineers provided
by this section shall include those from Contractor's suppliers. When so
requested, the installation engineer shall be responsible for providing
installation engineer shall initiate instructions for actions necessary for
proper receipt, inspection, handling, uncrating, assembly, and testing of
equipment. The installation engineer shall also keep a record of
measurements taken during erection and shall furnish one copy to the
Contracting Officer on request or on the completion of the installation of
assembly or part. The erecting engineer shall instruct the Contracting
Officer or others as designated in the operation and maintenance features
of the pump units.
PART 2
PRODUCTS
2.1
MATERIALS AND METALWORK FABRICATION
**************************************************************************
NOTE: The designer usually establishes
communication with pump manufacturers concerning
materials and design details appropriate for a
specific site. The designer should utilize HI
Standards, AWWA Standard 101-88, and paragraph
DESIGNATED MATERIALS for guidance. Also, Sections
05055 and 05502 (referenced below) need to be
included and edited.
**************************************************************************
Materials and fabrication shall conform to the requirements provided herein
and to Section 05055A METALWORK FABRICATION, MACHINE WORK, MISCELLANEOUS
PROVISIONS and Section 05502A METALS: MISCELLANEOUS, STANDARD ARTICLES,
SHOP FABRICATED ITEMS and to additional specified requirements.
Classifications and grade of material incorporated in the work shall be in
accordance with designated specifications. Deviations from the specified
materials shall be submitted in accordance with paragraph SUBMITTALS. The
materials of construction shall comply with the following:
SECTION 15132A
Page 16