3.1.2
Structural Members
Do not cut or alter.
Restore any damaged or defaced work to original
condition.
3.1.3
Safety Guards
Selector cables or tapes exposed to possibility of accidental contact in
machine room shall be completely enclosed with 1.5 mm thick 16 gage sheet
metal or expanded metal guards, both horizontally and vertically. Exposed
gears, sprockets, tape or rope sheaves, floor controllers, or signal
machines, and their driving ropes, chains or tapes, and selector drums
shall be guarded from accidental contact in accordance with ASME A17.1.
3.1.4
Miscellaneous Requirements
Include recesses, cutouts, slots, holes, patching, grouting, and
refinishing to accommodate elevator installation. Use core drilling to
drill all new holes in concrete. Finish work to be straight, level, and
plumb. During installation, protect machinery and equipment from dirt,
water, or mechanical damage. At completion, clean all work, and spot paint.
3.1.5
Firefighters' Service
Firefighters' service shall be complete including installation and wiring
of all smoke detectors in accordance with ASME A17.1, Rule 211.3b.
Coordinate smoke detector installation for Firefighters' Service.
3.2
FIELD QUALITY CONTROL
After completing elevators system installation, notify Contracting Officer
that elevator system is ready for final inspection and acceptance test.
Contracting Officer will obtain services of Naval Facilities Engineering
Command certified elevator inspector.
Contractor shall perform all required tests and demonstrate proper
operation of each elevator system and prove that each system complies with
contract requirements and ASME A17.1, and the applicable requirements of
A17.2.1 form a part of this inspection and acceptance testing. All testing
and inspections shall be conducted in the presence of the elevator
inspector. Demonstrate the proper operation of all equipment at various
date settings, selected by the elevator inspector, ranging from the date of
contract award through 1 January 2099.
Inspector shall complete, sign and post form NAVFACENGCOM 9-11014/23 (Rev.
7-88), Elevator Inspection Certificate, after successful completion of
inspection and testing.
3.2.1
Testing Materials and Instruments
Furnish testing materials and instruments required for final inspection.
Include calibrated test weights, tachometer, 600-volt megohm meter, volt
meter and ammeter, three Celsius calibrated thermometers, door pressure
gage, spirit level, stop watch, dynamometer, and 30 meter 100 foot tape
measure.
SECTION 14210N