2.12.2
Emergency Medical Services
**************************************************************************
NOTE: Use the following for buildings of four
stories or more in height.
**************************************************************************
ICBO UBC, Chapter 30 for elevators and sinage.
[2.13
EMERGENCY POWER OPERATION
**************************************************************************
NOTE: Use in hospitals and any building in which
sufficient standby power is provided to operate one
or more elevators.
**************************************************************************
Upon outage of normal power and initiation of emergency power, provide
circuitry and wiring to operate elevator[, telephone][ and ][intercom]
[and] to accomplish operation sequences.[ In multiple elevator system, one
elevator travels automatically to main floor, opens doors, and shuts down.
Thereafter, each other elevator in group one at a time returns
automatically to main floor. After all cars have returned to main floor,
automatically provide one [passenger][freight] car in regular service.][
For single elevator system, elevator travels automatically to main floor,
opens doors, and automatically places itself in regular service.] For
emergency power, operation, provide sign reading "EMERGENCY POWER" flashing
in each car station.[ At same time, provide operable Firefighters'
Service.]
][2.14
PROVISIONS FOR EARTHQUAKE PROTECTION
**************************************************************************
NOTE: Use in seismic Zones 3 and 4. Provide
seismic protection as covered by ASME A17.1, Part
XXIV. Provide fastenings, attachments, and
restraints for prevention of seismic damage in
detail by registered structural engineer and his
seal applied to drawings or sketches. Use forces of
1.0 G horizontal and 1.0 G vertical or heavier.
**************************************************************************
ASME A17.1, Part XXIV. This facility is located in a seismic zone [3][4],
comply with all ASME A17.1, Part XXIV requirements.
]PART 3
EXECUTION
3.1
INSTALLATION
Install in accordance with manufacturer's instructions, ASME A17.1, 36 CFR
1191, and NFPA 70.
3.1.1
Traveling Cables
Do not allow abrupt bending of traveling cables.
SECTION 14210N
Page 27