NOTE: For projects administered by the Pacific
Division, Naval Facilities Engineering Command, use
the optional "SUBMITTALS" article immediately below
and delete the general "SUBMITTALS" article above
for Navy projects.
**************************************************************************
[ The [_____] Division, Naval Facilities Engineering Command, Fire Protection
Engineer delegates the authority to the Quality Control (QC)
Representative's U.S. Registered Fire Protection Engineer for review and
approval of submittals required by this section. Submit to the [_____]
Division, Naval Facilities Engineering Command, Fire Protection Engineer
one set of all approved submittals and drawings immediately after approval
but no more later than 15 working days prior to final inspection.]
SD-02 Shop Drawings
Sprinkler heads and piping system layout; G
SD-03 Product Data
Piping; G
[Deluge] [Preaction] valves; G
Valves, including gate, check, and globe; G
[
Water motor alarms; G]
Sprinkler heads; G
Pipe hangers and supports; G
Pressure switch; G
Fire department connections; G
Detection devices; G
Storage batteries; G
Air maintenance device; G
Control panel; G
Battery charger; G
Backflow Preventer; G
Manual Remote Release Stations; G
Alarms; G