connections, drains, and other applicable details necessary to
clearly describe the proposed arrangement. Each type of fitting
used and the locations of bushings, reducing couplings, and welded
joints shall be indicated.
c. Actual center-to-center dimensions between sprinklers on
branch lines and between branch lines; from end sprinklers to
adjacent walls; from walls to branch lines; from sprinkler feed
mains, cross-mains and branch lines to finished floor and roof or
ceiling. A detail shall show the dimension from the sprinkler and
sprinkler deflector to the ceiling in finished areas.
d. Longitudinal and transverse building sections showing
typical branch line and cross-main pipe routing as well as
elevation of each typical sprinkler above finished floor.
e. Details of each type of riser assembly; pipe hanger; sway
bracing for earthquake protection, and restraint of underground
water main at point-of-entry into the building, and electrical
devices and interconnecting wiring.
panel modules to the devices, the number and size of conductors in
each conduit, and size of conduit. Connection points shall be
indicated and coordinated with the terminal identification marked
on the devices. Complete internal wiring schematic of the control
panel and each electrical device shall be provided. Detailed
description of the functions of the control panel and each module
shall be provided.
As-Built Drawings
As-built drawings, at least [14] [_____] days after completion
of the Final Tests. The Sprinkler System Drawings shall be
updated to reflect as-built conditions after all related work is
completed and shall be on reproducible full-size mylar film.
SD-03 Product Data
Fire Protection Specialist[; G][; G, [_____]]
The name and documentation of certification of the proposed Fire
Protection Specialists, no later than [14] [_____] days after the
Notice to Proceed and prior to the submittal of the sprinkler
system shop drawings and hydraulic calculations.
The name and documentation of certification of the proposed Fire
Protection Specialists, no later than [14] [_____] days after the
Notice to Proceed and prior to the submittal of the sprinkler
system shop drawings and hydraulic calculations.
Sprinkler System Installer Qualifications
The name and documentation of certification of the proposed
Sprinkler System Installer, concurrent with submittal of the Fire
Protection Specialist Qualifications.
The name and documentation of certification of the proposed