component, each panel component and the battery recharging period
shall be included.
Spare Parts
Spare parts data for each different item of material and
later than [_____] months prior to the date of beneficial
occupancy. Data shall include a complete list of parts and
supplies with the current unit prices and source of supply and a
list of the parts recommended by the manufacturer to be replaced
after [1] [_____] year of service.
Qualifications
Verification of experience and license number for Registered
Professional Engineer, as specified.
Training
Training course for the operation and maintenance staff. The
course shall be conducted in the building where the system is
installed or as designated by the Contracting Officer. The
training period shall consist of [3] [_____] training days (8
hours per day) and shall start after the system is functionally
completed but prior to final acceptance tests. The instructions
shall cover all of the items contained in the operating and
maintenance instructions.
Test Procedures
Detailed test procedures for the fire alarm reporting system
[30] [_____] days prior to performing system tests. The test
procedures shall be signed by the Registered Professional Engineer.
SD-06 Test Reports
Testing
Test reports in booklet form showing field tests performed to
prove compliance with the specified performance criteria, upon
completion and testing of the installed system. Each test report
shall document all readings, test results, and indicate the final
position of controls.
SD-07 Certificates
Equipment
Certified copies of current applicable approvals or listings
issued by UL, FM or other nationally recognized testing laboratory
showing compliance with applicable NFPA standards.
SD-10 Operation and Maintenance Data
Fire Alarm Reporting System[; G][; G, [_____]]
outlining step-by-step procedures required for system startup,
SECTION 13852A
Page 6