3.2
ADJUSTMENT, ALIGNMENT, SYNCHRONIZATION, AND CLEANING
Subsequent to installation, clean each system component of dust, dirt,
grease, or oil incurred during installation or accrued subsequent to
installation from other project activities, and prepared for system
activation by manufacturer's recommended procedures for adjustment,
alignment, or synchronization. Prepare each component in accordance with
appropriate provisions of component installation, operations, and
touch fencing.
3.3
FIELD QUALITY CONTROL
3.3.1
IDS Operational Test
Test shall ensure that the requisite degree of intrusion detection is
provided. Initially, test each sensor and subsystem component
individually. When the function of each component within a particular
subsystem such as each sensor within a particular zone is verified, certify
that subsystem of the entire IDS as satisfactorily meeting required
specifications. Test each subsystem similarly until each detection zone
has been certified. When subsystem certification is complete, test entire
integrated system to ensure that subsystem elements are compatible and
function as a complete system. Integrated system test shall be
accomplished in linear fashion, end-to-end, and shall verify that each
simulated intrusion performed within each detection zone produces an
appropriate alarm or signal. Integrated system test shall also verify that
alarm is correctly annunciated at the [local annunciator unit and the]
central alarm reporting and display unit. Provide for approval, not later
than 30 days prior to formal inspection and test, a detailed operational
test plan of how each component, subsystem, and entire IDS will be tested.
When tests are complete and corrections made, submit a signed and dated
certificate with a request for formal inspection and tests.
3.3.2
Formal Inspection and Test
3.3.2.1
Final Inspection
**************************************************************************
NOTE: For NORTHNAVFACENGCOM and other EFD's with a
designated IDS engineer, select the first bracketed
option for all projects. In all other areas, select
the second bracketed option for all projects.
**************************************************************************
The [_____] Division, Naval Facilities Engineering Command [IDS Engineer]
[Contracting Officer] will witness formal tests after receipt of written
certification that preliminary tests have been completed and that system is
ready for final inspection. [Manufacturer's technical representatives
shall be present for the final inspection and test.] Repeat preliminary
[IDS Engineer] [Contracting Officer]. Correct defects and conduct
additional tests to demonstrate that system conforms to contract
specifications.
3.3.2.2
IDS Final Test
Test each sensor within a detection zone and then test the entire zone in
accordance with applicable test procedures in the test plan for sensors
SECTION 13703N
Page 69