Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Tank Installation[; G][; G, [_____]]
Detail and erection drawings, before proceeding with any
fabrication. The drawings shall be complete with details of
steel, pipe, and concrete work and with details of the assembling
of items required for the complete installation. Standard welding
symbols as recommended by the American Welding Society shall be
used. Details of welded joints referenced on the drawings shall
be included.
SD-03 Product Data
General Requirements
Foundations
Design Analyses and Calculations.
SD-06 Test Reports
Tank Installation
Testing of Valves and Piping
Each coating manufacturer's technical data, application
for compliance for VOC content.
Copies of the following test results:
a.
Manufacturer's mill test reports for plate material.
b.
Mill and shop inspections by a commercial inspection agency.
c. After acceptance of the structure, the radiographic film and
test segments.
d. At the conclusion of the work, a written report prepared by
the Contractor covering the hydrostatic test and certifying that
the work was inspected in accordance with Section 11.2.1 of AWWA
D100.
SD-07 Certificates
General Requirements
Foundations
Certification by an independent third-party organization that
all interior coating and materials that come in contact with the
SECTION 13209
Page 7