b.
Conductors.
c.
Anodes.
d. Coating material in areas where welding and other work is
accomplished.
e.
f. Layout of anodes in tanks, test stations and isolation
points, and grounding.
g.
Special details.
h.
Certified experience data of installing firm.
i.
Exothermic weld equipment and material.
j.
Test station.
k. Welding method for electrical connections and steel ring
connections.
l.
Calculations for
(1)
Total current required for system.
(2)
Life of the anodes.
(3)
Anode geometry (showing areas of coverage).
submittal, in order to demonstrate that the items have been
properly coordinated and will function properly as a unit. A
notation shall be made on each shop drawing submitted as to the
item's specific use, either by a particular type number referenced
on the drawings or in the specifications, or by a description of
its specific location.
Contractor's Modifications[; G][; G, [_____]]
changes in location and scope or performance, indicating any
variations from, additions to, or clarifications of contract
drawings. The drawings shall show proposed changes in anode
arrangement, anode size and number, anode materials and layout
details, conduit size, wire size, mounting details, wiring
diagram, method for electrically isolating each pipe, and any
other pertinent information to the proper installation and
performance of the system.
SD-03 Product Data
Equipment[; G][; G, [_____]]
Within [30] [45] [____] days after receipt of notice to proceed,
an itemized list of equipment and materials including item number,
quantity, and manufacturer of each item. The list shall be
accompanied by a description of procedures for each type of