**************************************************************************
USACE / NAVFAC / AFCESA
UFGS-13095A (March 2004)
------------------------
Preparing Activity: USACE
Superseding
UFGS-13095A (July 2001)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated 23 June 2005
Latest change indicated by CHG tags
**************************************************************************
SECTION 13095A
ELECTROMAGNETIC (EM) SHIELDING
03/04
**************************************************************************
NOTE: This guide specification covers the
requirements for electromagnetic shielded facilities.
Comments and suggestions on this guide specification
are welcome and should be directed to the technical
proponent of the specification. A listing of
technical proponents, including their organization
designation and telephone number, is on the Internet.
Recommended changes to a UFGS should be submitted as
a Criteria Change Request (CCR).
Use of electronic communication is encouraged.
Brackets are used in the text to indicate designer
choices or locations where text must be supplied by
the designer.
**************************************************************************
PART 1
GENERAL
**************************************************************************
NOTE: The following information will be shown on
1.
Assembly details.
2.
Typical penetration details.
3. Method of mounting shielded enclosure within
building.
4. Shield penetration plan containing wall
elevations, floor and ceiling plans showing the
locations of all penetrations (to include all mech.,
electrical, fire protection, etc.) to the HEMP
shield.
SECTION 13095A
Page 5