Comply with detention manufacturer's standard fastening hardware and
recommendations for size, type, and material.
2.12.1
Fabrication
Finish exposed fasteners to match hardware fastened. Fabricate fasteners
of the same metal as hardware fastened, except use plated brass or
stainless steel for fastening aluminum.
2.12.2
Location
Provide spanner head screws and fasteners for exposed hardware.
2.13
TEMPLATE HARDWARE
Hardware to be applied to frames and to doors shall be made to template.
PART 3
EXECUTION
3.1
EXAMINATION
Examine doors, frames, and hardware for damage, defects, and suitability
for intended use. Inspect components and adjacent areas of construction
for conditions that could be detrimental to the proper operation or
performance of the detention hardware.
3.2
INSTALLATION
Sequence and procedures for installation shall be in accordance with
detention hardware manufacturer's instructions.
3.3
ADJUSTMENT AND CLEANING
Examine hardware for complete and proper installation. Lubricate bearing
surfaces of moving parts. Adjust hinges, locks, and keepers to function
properly. Test keys for smooth operation and for conformance to approved
keying system. Hardware shall operate freely without binding and be
properly aligned. Protect hardware from paint, stains, weather, and other
damage until acceptance of the work.
3.4
FIELD QUALITY CONTROL
After hardware has been installed and placed in operating order, conduct
performance tests which shall demonstrate to the Contracting Officer that
the hardware operates as specified. Remove items that fail to conform to
the requirements specified and replace with new.
3.5
TRAINING
Upon completion of the work and at a time designated by the Contracting
Officer, a manufacturer's technical service representative or
manufacturer's authorized representative for the locking control system,
shall instruct Government personnel in the proper operation,
troubleshooting, maintenance, safety, and emergency procedures of the
system. The period of instruction shall be four 8-hour sessions. Conduct
training at the job site. The Government shall have the option to video
tape training sessions. Notify the Contracting Officer at least two weeks
in advance.
SECTION 11194
Page 14