1. Reputtying and Reglazing: Replacement of [____]
linear meter feet of existing putty or glazing
compound with new material.
2. Resealing of Existing Exterior Joints:
Replacement of linear meter feet of sealant or
calking with new sealant.
3. Removal of Existing Coatings: Removal of
[_____] square meter feet of existing coating by
methods specified for each substrate material.
**************************************************************************
1.10.1
Painting Included
Where a space or surface is indicated to be painted, include the following
unless indicated otherwise.
a.
Surfaces behind portable objects and surface mounted articles
readily detachable by removal of fasteners, such as screws and
bolts.
b.
New factory finished surfaces that require identification or color
coding and factory finished surfaces that are damaged during
performance of the work.
c.
Existing coated surfaces that are damaged during performance of
the work.
1.10.1.1
Exterior Painting
Includes new surfaces[, existing coated surfaces,] [and] [existing uncoated
surfaces,] of the building[s] and appurtenances. Also included are
existing coated surfaces made bare by cleaning operations.
1.10.1.2
Interior Painting
Includes new surfaces[, existing uncoated surfaces,] [and] [existing coated
surfaces] of the building[s] and appurtenances as indicated and existing
coated surfaces made bare by cleaning operations. Where a space or surface
is indicated to be painted, include the following items, unless indicated
otherwise.
a.
Exposed columns, girders, beams, joists, and metal deck; and
b.
Other contiguous surfaces.
1.10.2
Painting Excluded
Do not paint the following unless indicated otherwise.
a.
Surfaces concealed and made inaccessible by panelboards, fixed
ductwork, machinery, and equipment fixed in place.
b.
Surfaces in concealed spaces. Concealed spaces are defined as
enclosed spaces above suspended ceilings, furred spaces, attic
spaces, crawl spaces, elevator shafts and chases.