submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-03 Product Data
Hardwood Parquet Flooring
Manufacturer's descriptive data, documentation stating physical
characteristics and flame resistance, and installation
instructions.
SD-04 Samples
Hardwood Parquet Flooring
[Two] [_____] samples of each type of parquet flooring.
Samples
shall be minimum 300 x 300 mm 12 x 12 inches.
SD-07 Certificates
Flooring Materials[; G][; G, [_____]]
Statement from the manufacturer attesting that the materials
meet the specified requirements. The statement must be dated
after the award of the contract, must state the Contractor's name
and address, must name the project and location, and must list the
specific requirements being certified.
SD-08 Manufacturer's Instructions
Adhesive
Finish
Premolded cork strips
SECTION 09645
Page 5