Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Storm windows
Submit drawings showing elevations of units, full-sized section,
thicknesses and gages of material, fastenings, methods of
anchorage, size and spacing of anchors, and locations of operating
hardware. Indicate method of glazing, method of attaching and
operating both screen and glass insert panels, and method and
materials for weatherstripping. Include mullion details, details
of installation, and connections with other work, including
details of existing windows and adjacent construction. Storm
window schedule shall show location of each unit.
SD-03 Product Data
Storm windows
Submit complete descriptive literature
for each type of storm
window and accessory. Clearly mark data
to indicate which type,
size, model, or item is to be provided.
Data shall conform to
specified requirements and shall include
instructions for
adjustments, cleaning, and maintenance.
SD-10 Operation and Maintenance Data
Storm windows, Data Package 1; G, [_____]
Submit data package in accordance with Section 01781 OPERATION
AND MAINTENANCE DATA.
1.3
DELIVERY, STORAGE, AND HANDLING
Deliver products to the project site in undamaged condition. Store
products out of contact with the ground under weathertight covering, and
protect against damage. Do not install damaged units.
1.4
FIELD MEASUREMENT
Dimensions shown are nominal. Field measure openings to obtain exact
dimensions needed for fabrication. Meeting rails or stiles of storm
windows shall align with the meeting rails or stiles of the prime windows.
SECTION 08582
Page 4