primer. After primer has dried, set flange on roofing membrane and strip-in
as specified in Section 07511 BUILT-UP ASPHALT ROOFING [(Aggregate
Surfaced)] [(Smooth Surfaced)] [(Mineral Surfaced)]. Nail flange securely
to wood nailer with large-head, barbed-shank roofing nails 38 mm 1.5 inches
long spaced not more than 75 mm 3 inches on centers, in two staggered rows.
3.1.15.1
Edge Strip
Hook the lower edge of fascias at least 20 mm 3/4 inch over a continuous
strip of the same material bent outward at an angle not more than 45
degrees to form a drip. Nail hook strip to a wood nailer at 150 mm 6 inches
maximum on centers. Where fastening is made to concrete or masonry, use
screws spaced 300 mm 12 inches on centers driven in expansion shields set
in the concrete or masonry. Where horizontal wood nailers are slotted to
provide for insulation venting, install strips to prevent obstruction of
vent slots. Where necessary, install strips over 2 mm 1/16 inch thick
compatible spacer or washers.
3.1.15.2
Joints
Leave open the section ends of gravel stops and fascias 6 mm 1/4 inch and
backed with a formed flashing plate, mechanically fastened in place and
lapping each section end a minimum of 100 mm 4 inches set laps in plastic
cement. Face nailing will not be permitted. Install prefabricated
aluminum gravel stops and fascias in accordance with the manufacturer's
printed instructions and details.
3.1.16
Metal Drip Edge
Provide a metal drip, designed to allow water run-off to drip free of
underlying construction, at eaves and rakes prior to the application of
roofing shingles. Apply directly on the wood deck at the eaves and over
the underlay along the rakes. Extend back from the edge of the deck not
more than 75 mm 3 inches and secure with compatible nails spaced not more
than 250 mm 10 inches on center along upper edge.
3.1.17
Gutters
**************************************************************************
NOTE: Where it is local practice to omit gutters
because of glaciation and ice damage, eave flashing
should be provided in accordance with paragraph
entitled "Eave Flashing."
**************************************************************************
The hung type of shape indicated and supported on underside by brackets
that permit free thermal movement of the gutter. Provide gutters in sizes
indicated complete with mitered corners, end caps, outlets, brackets, and
other accessories necessary for installation. Bead with hemmed edge or
reinforce the outer edge of gutter with a stiffening bar not less than 20
by 5 mm 3/4 by 3/16 inch of material compatible with gutter. Fabricate
gutters in sections not less than 2400 mm 8 feet. Lap the sections a
minimum of 25 mm one inch in the direction of flow or provide with
concealed splice plate 150 mm 6 inches minimum. Join the gutters, other
than aluminum, by riveted and soldered joints. Aluminum gutters shall be
joined with riveted sealed joints. Provide expansion-type slip joints
midway between outlets. Install gutters below slope line of the roof so
that snow and ice can slide clear. Support gutters on [adjustable hangers
spaced not more than 750 mm 30 inches on center] [as indicated] [by
continuous cleats] [and] [or] [by cleats spaced not less than 36 inches
SECTION 07600