"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-03 Product Data
ASPHALT
Felts, including ply felt, base sheet and ventilating felt as
applicable; G, [_____]
[
Granule Surface Modified Bitumen Cap Sheet; G, [_____]]
FLASHING MEMBRANE; G, [_____]
FASTENERS
PRIMER
ASPHALT ROOF CEMENT
walkpad materials
Vapor Pressure Relief Vents
CANT STRIPS
Certificate attesting that the fiberboard furnished for the
project contains recovered material, and showing an estimated
percent of such recovered material.
PRE-MANUFACTURED ACCESSORIES to be incorporated in the system
installation; G, [_____]
Sample warranties certificates; G, [_____]
Submit all data required by Section 07220 ROOF AND DECK
INSULATION, together with requirements of this section. Data
shall include written acceptance by the roof membrane manufacturer
of the products and accessories provided. Products shall be as
listed in the applicable wind uplift and fire rating
classification listings, unless approved otherwise by the
Contracting Officer.
SD-06 Test Reports
Samples of Built-Up Roofing
Submit test results on roofing field samples as required,
verifying composition of sample. Submit six copies of laboratory
analysis within 30 calendar days after samples are taken. Submit
reports in accordance with ASTM D 3617.
SD-07 Certificates
bill of lading
Submit when labels of asphalt containers do not indicate the
finished blowing temperature, flash point and equiviscous