Data Sheet 1-49 for method of attachment of nailers.
specified in Section 06100NA for wood which will be
in contact with bituminous materials.
**************************************************************************
Pressure-preservative-treated as specified in Section 06100 ROUGH CARPENTRY.
PART 3
EXECUTION
3.1
EXAMINATION AND PREPARATION
3.1.1
Surface Inspection
**************************************************************************
NOTE: Unless otherwise directed, do not refer to
vapor retarders for projects in the
SOUTHNAVFACENGCOM area. Vapor retarder may be
specified for heated buildings where the average
January temperature is below 5 degrees C (40 degrees
F) and the expected interior winter humidity exceeds
45 percent. Vapor retarder will be specified for
heated buildings where a high humidity condition is
expected, such as indoor swimming pool or laundry.
Where a vapor retarder is to be installed, the
that the dew point is on the cold side of the vapor
methods in agreement with ASHRAE Handbook,
Fundamentals.
**************************************************************************
Surfaces shall be clean, smooth, and dry. [Surfaces receiving vapor
retarder shall be free of projections which might puncture the vapor
retarder.] Check roof deck surfaces, including surfaces sloped to roof
drains and outlets, for defects before starting work.
The [Contractor shall] [Contracting Officer will] inspect and approve the
surfaces immediately before starting installation. Prior to installing
[vapor retarder] [ventilating felt] [insulation], perform the following:
[a.
Examine wood decks to ascertain that deck boards have been
properly nailed and that exposed nail heads have been set.]
[b.
Examine steel decks to ensure that panels are properly secured to
structural members and to each other and that surfaces of top
flanges are flat or slightly convex.]
[c.
Examine precast concrete decks to ensure that joints between
precast units are properly grouted and leveled to provide suitable
surfaces for installation of [ventilating felt] [vapor retarder]
[and] insulation.]
[d.
In the presence of the Contracting Officer perform the following
surface-dryness test on concrete substrates:
(1) Foaming: When poured on the deck, one pint of asphalt when
heated in the range of 176 to 204 degrees C 350 to 400 degrees F,
SECTION 07220
Page 18