for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-03 Product Data
Fluid-applied membrane
Membrane primer
Elastomeric sheet
Flexible foam-backed elastomeric sheet
Solvent
Moisture meter
Protection board
Bond breaker
details, and recommendations regarding shelf life, application
procedures, and precautions on flammability and toxicity.
1.3
PREWATERPROOFING CONFERENCE
**************************************************************************
NOTE: Include the requirement for a
prewaterproofing conference when the waterproofing
system will be used on large areas, e.g., promenade
decks over occupied space, and will require work by
other trades, e.g., mechanical subcontractors,
electrical subcontractor, or tile setters on the
membrane.
**************************************************************************
Prior to starting application of waterproofing system, arrange and attend a
prewaterproofing conference to ensure a clear understanding of drawings and
specifications. Give the Contracting Officer 7 days advance written notice
of the time and place of meeting. Ensure that the mechanical and
electrical subcontractor, flashing and sheetmetal subcontractor, and other
trades that may perform other types of work on or over the membrane after
installation, attend this conference.
1.4
DELIVERY, STORAGE, AND HANDLING
Deliver waterproofing materials in manufacturer's original, unopened
containers, with labels intact and legible. Containers of materials
covered by a referenced specification number shall bear the specification
number, type, and class of the contents. Deliver materials in sufficient
quantity to continue work without interruption. Store and protect
SECTION 07141
Page 6