Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-03 Product Data
Elastomeric waterproofing sheet material; G, [_____]
Protection board
Primers, adhesives, and mastics
SD-04 Samples
Corner and field condition
[
Attachment to existing waterproof sheeting]
SD-06 Test Reports
Elastomeric waterproofing sheet material
Certify compliance with performance requirements specified
herein.
SD-08 Manufacturer's Instructions
adhesives and mastics.
1.3
QUALITY ASSURANCE
1.3.1
Shop Drawing Requirements
application details; recommendations regarding shelf life, application
procedures; requirements for protective covering; and precautions for
flammability and toxicity.
1.4
DELIVERY, STORAGE, AND HANDLING
Deliver and store materials out of the weather, in manufacturer's original
SECTION 07131
Page 6