3.10.3
Reports
All results of tests or inspections conducted shall be reported informally
as they are completed and in writing daily. A weekly report shall be
prepared for the updating of control charts covering the entire period from
the start of the construction season through the current week. During
periods of cold-weather protection, reports of pertinent temperatures shall
be made daily. These requirements do not relieve the Contractor of the
obligation to report certain failures immediately as required in preceding
paragraphs. Such reports of failures and the action taken shall be
confirmed in writing in the routine reports. The Contracting Officer has
the right to examine all contractor quality control records.
-- End of Section --