PROPERTY
FINE AGGREGATE
COARSE AGGREGATE
TESTS
[Petrographic
Examination
(including percent
with fractured face)
Every 6 months
Every 6 months
[_____]]
[Chert, less than
2.40 specific
gravity
Every 6 months
Every 6 months
ASTM C 123]
[Coal and Lignite,
less than 2.00
specific gravity
Every 6 months
Every 6 months
ASTM C 123]
or ASTM C 295
b. Corrective Action for Aggregate Quality - If the result of a
quality test fails to meet the requirements for quality during
submittal of samples for mixture-proportioning studies or immediately
prior to start of concrete placement, production procedures or
materials shall be changed and additional tests shall be performed
until the material meets the quality requirements prior to proceeding
with either mixture-proportioning studies or starting concrete
placement. After concrete placement commences, whenever the result of
a test for quality fails the requirements, the test shall be rerun
immediately. If the second test fails the quality requirement, the
fact shall be reported to the Contracting Officer and immediate steps
taken to rectify the situation.
3.10.2.4
Scales
a. Weighing Accuracy - The accuracy of the scales shall be checked by
test weights at least once a month for conformance with the applicable
requirements of paragraphs BATCH PLANT and CONTINUOUS MIXING PLANT.
Such tests shall also be made as directed whenever there are variations
in properties of the fresh concrete that could result from batching
errors.
b. Batching and Recording Accuracy - Once a week the accuracy of each
batching and recording device shall be checked during a weighing
operation by noting and recording the required weight, recorded weight,
and the actual weight batched. The Contractor shall confirm that the
calibration devices described in paragraph BATCH PLANT for checking the
accuracy of dispensed admixtures are operating properly. If a
continuous mixing plant is provided, the accuracy and operation of all
feeding and dispensing units shall be checked before the start of
operation each day.
c. Scales Corrective Action - When the weighing accuracy or batching
accuracy does not comply with specification requirements, the plant
shall not be operated until necessary adjustments or repairs have been
made. Discrepancies in recording accuracies shall be corrected
immediately.
3.10.2.5
Concrete Plant Control
The measurement of all constituent materials including cementitious
SECTION 03701
Page 62