Ground iron blast-furnace slag
Silica fume
Aggregates
Admixtures
[
Fiber-reinforced concrete]
Cement
Water
Reinforcement and protective coating; G, [_____]
SD-07 Certificates
**************************************************************************
NOTE: Include subparagraphs a and b when job
complexity justifies the additional cost associated
with these requirements. Subparagraphs c and d will
be mandatory for all projects.
**************************************************************************
[
Curing concrete elements]
[
Form removal schedule]
Concrete placement and compaction
[
Silica fume manufacturer's supplier representative]
Field testing technician and testing agency
Mixture designs
1.4
MODIFICATION OF REFERENCES
Accomplish work in accordance with ACI publications except as modified
herein. Consider the advisory or recommended provisions to be mandatory,
as though the word "shall" had been substituted for the words "should" or
"could" or "may," wherever they appear. Interpret reference to the
"Building Official," the "Structural Engineer," and the
"Architect/Engineer" to mean the Contracting Officer.
1.5
DELIVERY, STORAGE, AND HANDLING
Do not deliver concrete until vapor barrier, forms, reinforcement, embedded
items, and chamfer strips are in place and ready for concrete placement.
ACI 301 and ASTM A 934/A 934M for job site storage of materials. Store
reinforcement of different sizes and shapes in separate piles or racks
raised above the ground. Protect materials from contaminants such as
grease, oil, and dirt. Ensure materials can be accurately identified after
bundles are broken and tags removed.
SECTION 03311
Page 13