3.2
Cleaning and Surface Preparation
After the aggregate surface hardener system has cured for 28 days, the
Contractor shall clean and buff the floor surfaces in accordance with the
manufacturer's recommendations. The cleaning and surface preparation shall
be performed to remove projections that permit soil and foreign bodies to
embed into the floor and to permit easier cleaning of a less porous, more
densified concrete surface.
-- End of Section --