3.3.2.2
Testing
**************************************************************************
NOTE: Testing standards and limits for contaminated
soil vary widely from state to state. Designer must
contact the appropriate State regulatory authority
to determine the testing standards and the cleanup
levels to specify.
**************************************************************************
a.
The soil shall contain no free liquid as demonstrated by EPA
530/F-93/004, Method 9095, paint filter liquids test.
b.
The sum of benzene, toluene, ethyl benzene, and xylene (BTEX)
concentrations shall be determined by using EPA 530/F-93/004,
Method [5030/8020] [_____].
c.
TPH (total petroleum hydrocarbons) concentrations shall be
determined by using EPA 530/F-93/004, Method [8015] [_____], which
has been modified for use with soil.
d.
Material shall be tested for TOX (total organic halogens) in
accordance with EPA 530/F-93/004, Method [9020] [_____].
e.
Material shall be analyzed for full TCLP in accordance with EPA
530/F-93/004, Method [1311][_____] and for ignitability,
f.
Material shall be tested for polychlorinated biphenyls (PCB's) in
accordance with EPA 530/F-93/004, Method [8080] [_____].
g.
Moisture content of the sample shall be determined in accordance
with EPA Method 160.3.
h.
[_____].
3.3.2.3
Disposal of Stockpiled Soils
a.
Soils exhibiting TPH less than [100] [_____] ppm, BTEX less than
[10] [_____] ppm, TOX less than [100] [_____] ppm, passing TCLP
tests, and testing negative for PCB's shall be considered clean as
shall be disposed of [on-site] [on station] as directed by the
Contracting Officer.
b.
Soils failing the TCLP test or exhibiting TOX greater than [100]
[_____] ppm shall be managed in accordance with [applicable State
and local regulations] [_____]. Payment for disposal of materials
failing the TCLP metals test or TOX test shall be made in
accordance with the "CHANGES" clause of the General Conditions.
c.
If the concentration of total BTEX is greater than [10] [_____]
ppm or TPH greater than [100] [_____] ppm, the soil shall be
treated and disposed of at a permitted soil recycling facility.
3.4
WELL INSTALLATION
Well installation shall be in accordance with ASTM D 5092 and EPA
600-4-89-034, and as indicated on the well construction drawings submitted
by the CPC and approved by the Contracting Officer. Borehole shall be
SECTION 02525N
Page 14