USACE / NAVFAC / AFCESA
UFGS-02398 (May 2003)
------------------------------
Preparing Activity: NAVFAC
Superseding
UFGS-02398N (September 1999)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated 23 June 2005
**************************************************************************
SECTION 02398
PIER TIMBERWORK
05/03
**************************************************************************
NOTE: This guide specification covers the
requirements for timber piers and timber work on
other than timber piers.
Comments and suggestions on this guide specification
are welcome and should be directed to the technical
proponent of the specification. A listing of
technical proponents, including their organization
designation and telephone number, is on the Internet.
Recommended changes to a UFGS should be submitted as
a Criteria Change Request (CCR).
Use of electronic communication is encouraged.
Brackets are used in the text to indicate designer
choices or locations where text must be supplied by
the designer.
**************************************************************************
**************************************************************************
NOTE: This specification also includes requirements
for framing of timber bearing and fender piles to
other pier work where required. Specification
requirements for timber bearing and fender piles
will be found in Section 02458 TIMBER PILES for
fresh water use and in Section 02461 WOOD MARINE
PILES for marine use. Due to the severity of salt
water environment, glued laminated wood is not
included in this guide specification.
**************************************************************************
**************************************************************************
1. Location, size, thickness, and stress rating of
timbers
2.
Size and spacing of fasteners
3.
Soil data, where required.
SECTION 02398