Cemeteries are in the area to be cleared. The Contractor shall not disturb
or destroy any grave marker, or allow any vehicle to pass over a grave, or
otherwise disturb the surface of the ground over any grave. The Contractor
shall adequately mark the graves to insure that equipment does not work
over the areas. Graves and headstones or markers will be relocated by
others.]
1.3.2.3
Markings of Zones
**************************************************************************
NOTE: Alternate 1.
**************************************************************************
The [_____] and [_____] contour lines have been established in the field by
the Government. The contour lines are identified by stakes on the lines or
by painted bands on trees near the lines. The [_____] contour is marked
with [_____] paint and the [_____] contour is marked with [_____] paint.
[Other boundaries are marked by identifiable topographical features or by
section or fractional section lines.]
1.3.2.4
Zones
**************************************************************************
NOTE: Alternate 2.
When Alternate 2 is used independently of Alternate
1, the boundaries should be completely described.
Similarly, this section should be further modified
to include all other applicable portions of
Alternate 1.
**************************************************************************
The boundaries of the zones are as described in paragraph BOUNDARIES,
subparagraphs ZONE 1 and ZONE 2.
1.3.2.5
Fences
a. Zone 1 - No clearing of fences is required in Zone 1; however, the
Contractor may, at his option, remove any or all fence materials from
the area and dispose of such materials off the reservoir area.
b. Zone 2 - All fences in Zone 2, except in those areas where no
timber clearing is required, shall be cleared.
1.3.2.6
Structures
Combustible materials obtained from removal of structures shall be burned
in accordance with paragraph DISPOSAL OF MATERIAL or disposed of off the
reservoir area. Where filling of structures is required, fill to within
450 mm 18 inches of the ground surface shall be made with noncombustible
materials such as masonry rubble, and other debris. When all available
debris has been used in filling, all remaining unfilled portions, together
with the above 450 mm 18 inches shall be completely filled to the ground
surface with earth, borrowed as directed by the Contracting Officer. The
top surfaces of fills shall be neat in appearance and smooth enough not to
constitute a hazard to persons or livestock.
SECTION 02233