SECTION 02233
CLEARING FOR CIVIL WORKS
07/02
**************************************************************************
NOTE: This guide specification covers the
requirements for furnishing all labor and equipment
and performing all work required for clearing and
disposal of trees, stumps, clearing fences,
buildings, and other structures and disposal of
debris, trash, and materials resulting from clearing
operations within the limits indicated on the
drawings and/or specified.
Comments and suggestions on this guide specification
are welcome and should be directed to the technical
proponent of the specification. A listing of
technical proponents, including their organization
designation and telephone number, is on the Internet.
Recommended changes to a UFGS should be submitted as
a Criteria Change Request (CCR).
Use of electronic communication is encouraged.
Brackets are used in the text to indicate designer
choices or locations where text must be supplied by
the designer.
This guide specification has been prepared for use
in reservoir clearing operations. It has two
alternates, one which is concerned with the clearing
of timber lands and the other one deals with the
removal of man-made structures, debris, etc.
**************************************************************************
PART 1
GENERAL
1.1
UNIT PRICES
**************************************************************************
NOTE: If Section 01270 MEASUREMENT AND PAYMENT is
paragraph title (UNIT PRICES) should be deleted from
this section and the remaining appropriately edited