Demolition plan[; G][; G, [_____]]
Notifications[; G][; G, [_____]]
[Notification of Demolition and Renovation forms[; G][; G, [_____]
]]
Proposed [salvage,] demolition and removal procedures for
approval before work is started.
SD-11 Closeout Submittals
Receipts
Receipts or bills of laden, as specified.
1.4
REGULATORY AND SAFETY REQUIREMENTS
Comply with federal, state, and local hauling and disposal regulations.
In
addition to the requirements of the "Contract Clauses," conform to the
safety requirements contained in ANSI A10.6.
1.4.1
Notifications
1.4.1.1
General Requirements
Furnish timely notification of [demolition] [and] [renovation] projects to
Federal, State, regional, and local authorities in accordance with 40 CFR
61-SUBPART M. Notify the [Regional Office of the United States
Officer in writing 10 working days prior to the commencement of work in
accordance with 40 CFR 61-SUBPART M.
1.4.1.2
Hawaii Requirements
**************************************************************************
NOTE: Use the following for Hawaii projects only.
"Notification of Demolition and Renovation" form is
required for all demolition involving
"load-supporting" structures and/or asbestos work.
Use the first bracket for "demolition" work that
does not involve asbestos, or "demolition" work
where the combined amount of RACM to be stripped,
removed, dislodged, cut, drilled, or similarly
disturbed is less than 80 linear meters (260 linear
feet) on pipes or less than 15 square meters (160
square feet) on other facility components. Use the
second bracket for "demolition" and/or "renovation"
work when the amount of RACM is greater than those
stated above.
"Demolition" means the wrecking or taking out of any
"load-supporting structural member" of a facility
intentional burning of any facility. "Renovation"
means altering a facility or one or more facility
components in any way, including the stripping or
removal of RACM from a facility component.
"Regulated asbestos-containing material" (RACM)
means:
SECTION 02220
Page 7