15 m 50 feet, sample locations, and sample identification numbers.
i.
Progress Photographs. The Contractor shall take a minimum of 4
views of the site showing such things as the location of each
tank, entrance/exit road, and any other notable site condition
before work begins. After work has been started at the site, the
Contractor shall photographically record activities at each work
location daily. Photographs shall be 76.2 x 127.0 mm (3 x 5
inches) 3 x 5 inches and shall include:
(1)
Soil removal, handling, and sampling.
(2) Unanticipated events such as discovery of additional
contaminated areas.
(3)
Soil stockpile area.
(4)
Tank.
(5) Site or task-specific employee respiratory and personal
protection.
(6)
Fill placement and grading.
(7) Post-construction photographs. After completion of work at
each site, the Contractor shall take a minimum of four (4) views
of the site. Prints shall illustrate the condition and location
of work and the state of progress. The photographs shall be
mounted and enclosed back-to-back in a double face plastic sleeve
punched to fit standard three ring binders. Each color print
shall show an information box, 40 x 90 mm 1-1/2 x 3-1/2 inches.
The information box for the 76.2 x 127.0 mm (3 x 5 inch) 3 x 5 inch
photographs shall be scaled down accordingly, or taped to the
bottom of the photo. The box shall be typewritten and arranged as
follows:
Project No.
Contract No.
Location
Contractor/Photographer
Photograph No.
Date/Time:
Description
Direction of View
-- End of Section --