in this paragraph.
**************************************************************************
The Contractor shall obtain required federal, state, and local permits for
excavation and storage of contaminated material. Permits shall be obtained
at no additional cost to the Government.
1.5.2
Air Emissions
**************************************************************************
NOTE: An air pathway analysis should be performed
during design to determine what air monitoring and
controls are required. Guidance on air pathway
analyses is provided in EP 1110-1-21 Air Pathway
Analysis for the Design of Hazardous, Toxic, and
Radioactive Waste (HTRW) Remedial Action Projects.
Specify perimeter air monitoring requirements in
Section 01355 ENVIRONMENTAL PROTECTION.
**************************************************************************
Air emissions shall be monitored and controlled in accordance with Section
01355.
1.6
DESCRIPTION OF WORK
**************************************************************************
NOTE: Include any pertinent information regarding
project/site conditions in this paragraph, the
appendices to the specifications, or on the drawings.
If oversize material such as debris and foundations
are present, the specification should describe
treatment, handling, and disposal requirements for
this material. Measurement and payment procedures
should also be described for this material.
If clean soil overlies the contaminated material,
the specification should describe how this material
will be measured, removed, stored, and tested to
verify they are clean.
**************************************************************************
The work shall consist of excavation and temporary storage of approximately
[_____] cubic meters yards of contaminated material. Approximate locations
of contaminated material are shown on the drawings. Characterization data
on the nature and extent of the contaminated material is shown in Appendix
[_____]. Subsurface conditions are shown [on the drawings] [in Appendix
[_____]]. The Contractor shall submit a Work Plan as specified in the
Submittals paragraph. The Contracting Officer shall be notified within
[24] [_____] hours, and before excavation, if contaminated material is
discovered that has not been previously identified or if other
discrepancies between data provided and actual field conditions are
discovered. Backfill material is [not available onsite] [available onsite
and typically consists of [_____]]. Ground water is approximately [_____]
meters feet below pre-excavation ground surface.
1.7
CHEMICAL TESTING
SECTION 02111
Page 8