shall be fully completed, including testing and inspection, prior to
contract completion date, except as noted otherwise in Section 15950N. The
time required to complete all work and testing as prescribed by Sections [
15901N] [15910N] and 15950N is included in the allotted calendar days for
completion.
]1.8
CLEANUP
Leave premises "broom clean." Clean interior and exterior glass surfaces
exposed to view; remove temporary labels, stains and foreign substances;
polish transparent and glossy surfaces; vacuum carpeted and soft surfaces.
Clean equipment and fixtures to a sanitary condition. [Clean] [Replace]
filters of operating equipment. Clean debris from roofs, gutters,
landscaped areas. Remove waste and surplus materials, rubbish and
construction facilities from the site.
[1.8.1
Extraordinary Cleanup Requirements
**************************************************************************
NOTE: Do not add information related to station
regulations which are of a routine nature. Include
unusual cleanup requirements.
**************************************************************************
The following cleanup requirements apply:
[_____].
]PART 2
PRODUCTS
Not used.
PART 3
EXECUTION
Not used.
-- End of Section --
SECTION 01770N
Page 8