[1.6
EQUIPMENT/PRODUCT WARRANTIES
1.6.1
Equipment/Product Warranty List
Furnish to the Contracting Officer a bound and indexed notebook containing
written warranties for equipment/products furnished under the contract, and
prepare a complete listing of such equipment/products. The
equipment/products list shall state the specification section applicable to
the equipment/product, duration of the warranty therefor, start date of the
warranty, ending date of the warranty, and the point of contact for
fulfillment of the warranty. The warranty period shall begin on the same
date as project acceptance and shall continue for the full product warranty
period. Execute the full list and deliver to the Contracting Officer prior
to final acceptance of the facility.
1.6.2
Equipment Warranty Tags and Guarantor's Local Representative
Furnish with each warranty the name, address, and telephone number of the
guarantor's representative nearest to the location where the equipment and
appliances are installed. The guarantor's representative, upon request of
the station representative, shall honor the warranty during the warranty
period, and shall provide the services prescribed by the terms of the
warranty. At the time of installation, tag each item of warranted
equipment with a durable, oil- and water-resistant tag approved by the
Contracting Officer. Attach tag with copper wire and spray with a clear
silicone waterproof coating. Leave the date of acceptance and QC's
signature blank until project is accepted for beneficial occupancy. Tag
shall show the following information:
EQUIPMENT/PRODUCT WARRANTY TAG
Type of Equipment/Product ____________________
Warranty Period __________ From __________ To __________
Contract No. ____________________
Inspector's Signature _____________________ Date Accepted ____________
Construction Contractor:
Name: ____________________
Address: _______________________
Telephone: _______________________
Warranty Contact: __________________
Name: ____________________
Address: ________________________
Telephone: ________________________
STATION PERSONNEL TO PERFORM ONLY OPERATIONAL MAINTENANCE
][1.7
MECHANICAL TESTING AND BALANCING
**************************************************************************
NOTE:
Use for projects as directed by the
Government.
**************************************************************************
All contract requirements of Section [15901N SPACE TEMPERATURE CONTROL
SYSTEMS] [15910N DIRECT DIGITAL CONTROL SYSTEMS] shall be fully completed,
including all testing, prior to contract completion date. In addition, all
contract requirements of Section 15950N HVAC TESTING/ADJUSTING/BALANCING
SECTION 01770N
Page 7