1.2
MEASUREMENT AND PAYMENT
**************************************************************************
NOTE: These paragraphs should be deleted if the
work is in one lump-sum contract price. Coordinate
requirements of these paragraphs with the bidding
schedule.
**************************************************************************
1.2.1
Measurement
**************************************************************************
NOTE: Modify this paragraph if the method of
payment will be on a weight basis.
**************************************************************************
Measurement for excavation and on-site transportation shall be based on the
actual number of cubic meters yards of contaminated material in-place prior
to excavation. Determination of the volume of contaminated material
excavated shall be based on cross-sectional volume determination reflecting
the differential between the original elevations of the top of the
contaminated material and the final elevations after removal of the
contaminated material. Measurement for backfilling of excavated areas
shall be based on in-place cubic meters yards of compacted fill.
Measurement for construction of stockpile areas shall be based on the
number of square meters yards of stockpile liner constructed.
1.2.2
Payment
1.2.2.1
Excavation and Transportation
Compensation for excavation and onsite transportation of contaminated
material will be paid as a unit cost. This unit cost shall include any
other items incidental to excavation and handling not defined as having a
specific unit cost.
1.2.2.2
Backfilling
Compensation for backfill soil, transportation of backfill, backfill soil
conditioning, backfilling, compaction, and geotechnical testing will be
paid as a single unit cost.
1.2.2.3
Stockpiling
Compensation for construction of stockpile areas will be paid for as a unit
cost. This unit cost shall include all aspects of grading, preparation,
SECTION 02111
Page 5