projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
SD-03 Product Data
Spare Parts
Spare parts data for each different item of material and
equipment specified.
SD-06 Test Reports
Approved Test Procedures[; G][; G, [_____]]
Test plan and test procedures for the acceptance tests. The
test plan and test procedures shall explain in detail,
step-by-step actions and expected results to demonstrate
compliance with the requirements specified. The procedure shall
also explain methods for simulating the necessary conditions of
operation to demonstrate system performance.
Acceptance Tests
Test reports in booklet form showing all field tests performed
to adjust each component and to prove compliance with the
specified performance criteria, upon completion and testing of the
installed system. The reports shall include the manufacturer,
model number, and serial number of test equipment used in each
test. Each report shall indicate the final position of controls
and operating mode of the system.
SD-07 Certificates
Components
Copies of current approvals or listings issued by UL, or other
nationally recognized testing laboratory for all components.
SD-10 Operation and Maintenance Data
Radio and Public Address System
SECTION 16770
Page 5