the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Installation drawings; G
SD-03 Product Data
Light fixtures; G
Controls; G
SD-07 Certificates
Installation report
Certify that the equipment has been properly installed,
adjusted, and tested, and that each surgical light fixture meets
SD-10 Operation and Maintenance Data
Light fixtures, Data Package 5
Submit in accordance with Section 01781 OPERATION AND
MAINTENANCE DATA.
1.5
QUALITY ASSURANCE
1.5.1
Installation drawings
Submit shop drawing for each specified lighting fixture to include the
following:
a.
Mounting detail for the lighting fixture[, transformer and
control] assembly.
b.
connections to normal and emergency power in the building.
Manufacturer's catalog data may be submitted for internal wiring
description.
1.6
DELIVERY, STORAGE, AND HANDLING
Package each lighting fixture and protect in accordance with the
manufacturer's instructions.
SECTION 16553N