be washed out, special precautions shall be taken to ensure durable pole
foundations, and the setting depth shall be measured from the lower side of
the pole. Holes shall be dug large enough to permit proper use of tampers
to the full depth of a hole. Earth shall be placed into a hole in 150 mm 6
inch maximum layers, then thoroughly tamped before the next layer is
placed. Surplus earth shall be placed around a pole in a cone and packed
tightly to drain water from poles.
TABLE I - MINIMUM POLE-SETTING DEPTH
(Meters)
Curves,
Length
Corners, and
Overall
Straight
Points of
Meters
Lines
Extra Strain
6.1
1.5
1.5
7.6
1.7
1.7
9.2
1.7
1.7
10.7
1.8
1.8
12.2
1.8
2.0
13.7
2.0
2.1
15.2
2.1
2.3
16.7
2.3
2.5
18.3
2.5
2.6
TABLE I - MINIMUM POLE-SETTING DEPTH
(Feet and Inches)
Curves,
Length
Corners, and
Overall
Straight
Points of
Feet
Lines
Extra Strain
20
5-0
5-0
25
5-6
5-6
30
5-6
5-6
35
6-0
6-0
40
6-0
6-6
45
6-6
7-0
50
7-0
7-6
55
7-6
8-0
60
8-0
8-6
3.11.5
Aluminum, Steel, Fiberglass and Concrete Pole Installation
Poles shall be mounted on cast-in-place or power-installed screw
foundations. Concrete poles shall be embedded in accordance with the
details shown. Conduit elbows shall be provided for cable entrances into
pole interiors.
3.11.5.1
Cast-In-Place Foundations
Concrete foundations, sized as indicated, shall have anchor bolts
accurately set in foundations using templates supplied by the pole
manufacturer. Concrete work and grouting is specified in Section 03300A
CAST-IN-PLACE STRUCTURAL CONCRETE. After the concrete has cured, pole
anchor bases shall be set on foundations and leveled by shimming between
anchor bases and foundations or by setting anchor bases on leveling nuts