Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for [Contractor Quality Control
approval.] [information only. When used, a designation following the "G"
designation identifies the office that will review the submittal for the
Government.] The following shall be submitted in accordance with Section
01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Schematic, external connection, one-line schematic and wiring
diagram of each ATS assembly.
Equipment
Installation
Dimensioned plans, sections and elevations showing minimum
clearances, weights, and conduit entry provisions for each ATS.
SD-03 Product Data
Material
Equipment
List of proposed equipment and material, containing a
description of each separate item.
SD-06 Test Reports
Testing[; G][; G, [_____]]
A description of proposed field test procedures, including
proposed date and steps describing each test, its duration and
expected results, not less than [_____] weeks prior to test date.
Certified factory and field test reports, within 14 days following
completion of tests. Reports shall be certified and dated and
shall demonstrate that tests were successfully completed prior to
shipment of equipment.
SD-07 Certificates
Equipment
Material
Certificates of compliance showing evidence of UL listing and
conformance with applicable NEMA standards. Such certificates are
not required if manufacturer's published data, submitted and
approved, reflect UL listing or conformance with applicable NEMA
standards.
Switching Equipment
Evidence that ATS withstand current rating (WCR) has been
SD-10 Operation and Maintenance Data
SECTION 16410A
Page 6