fireproofing cables.
2.15.3
Plastic Tape
Preapplication plastic tape shall be pressure sensitive, 0.254 mm 10 mil
thick, conforming to UL 510.
2.16
LIQUID DIELECTRICS
**************************************************************************
NOTE: Select 2 ppm for Air Force projects.
**************************************************************************
Liquid dielectrics for transformers, capacitors, reclosers, and other
liquid-filled electrical equipment shall be non-polychlorinated biphenyl
(PCB) mineral-oil or less-flammable liquid as specified. Nonflammable
fluids shall not be used. Tetrachloroethylene (perchloroethylene) and 1,
2, 4 trichlorobenzene fluids shall not be used. Liquid dielectrics in
retrofitted equipment shall be certified by the manufacturer as having less
manufacturer's certification, the Contractor may submit a test sample of
the dielectric in accordance with ASTM D 923 and have tests performed per
ASTM D 4059 at a testing facility approved by the Contracting Officer.
Equipment with test results indicating PCB level exceeding [50] [2] ppm
shall be replaced.
2.17
FACTORY TESTS
**************************************************************************
NOTE: Delete tests that are not applicable to the
project. Refer to TM 5-811-1/AF AFJMAN 32-1080.
Tests must be justified.
**************************************************************************
Factory tests shall be performed, as follows, in accordance with the
applicable publications and with other requirements of these
specifications. The Contracting Officer shall be notified at least [10]
[_____] days before the equipment is ready for testing. The Contracting
Officer reserves the right to witness the tests.
a.
Transformers: Manufacturer's standard [routine] [design] [and]
[other] tests in accordance with IEEE C57.12.00.
b.
chopped-wave, and full-wave impulse test on each line and neutral
terminal, in accordance with IEEE C57.98.
c.
High-Voltage Air Switches: Manufacturer's standard tests in
accordance with IEEE C37.34 and IEEE C37.41.
d.
Protective Relays: Seismic tests in accordance with IEEE C37.98.
Surge withstand tests in accordance with IEEE C37.90.1.
e.
Relaying Current Transformers:
Manufacturer's standard tests in
accordance with IEEE C57.13.
f.
Instrument Current Transformers:
Manufacturer's standard tests in
accordance with IEEE C57.13.
SECTION 16375A