e.
High-Voltage Air Switches: Manufacturer's standard tests in
accordance with IEEE C37.34 and IEEE C37.41.
f.
Protective Relays: Seismic tests in accordance with IEEE C37.98.
Surge withstand tests in accordance with IEEE C37.90.1.
g.
Manufacturer's standard tests in
accordance with IEEE C57.13.
h.
Manufacturer's standard tests in
accordance with IEEE C57.13.
i.
Voltage Regulators:
Manufacturer's standard tests in accordance
with IEEE C57.15.
j.
High-Voltage Fuses:
Manufacturer's standard tests in accordance
with IEEE C37.41.
k.
Neutral Grounding Resistor: Manufacturer's standard tests in
accordance with IEEE Std 32.
l.
Manufacturer's standard tests in
accordance with ANSI C29.1.
m.
[_____]
PART 3
EXECUTION
3.1
GENERAL INSTALLATION REQUIREMENTS
Equipment and devices shall be installed and energized in accordance with
the manufacturer's published instructions. Circuits installed in conduits
or underground and splices and terminations for medium-voltage cable shall
conform to the requirements of Section 16375A ELECTRICAL DISTRIBUTION
SYSTEM, UNDERGROUND. Secondary circuits installed in conduit on poles
shall conform to the requirements of Section 16402 INTERIOR DISTRIBUTION
SYSTEM.
3.1.1
Conformance to Codes
The installation shall comply with the requirements and recommendations of
NFPA 70 and IEEE C2.
3.1.2
Verification of Dimensions
The Contractor shall become familiar with details of the work, shall verify
dimensions in the field, and shall notify the Contracting Officer of any
discrepancy before performing any work.
3.1.3
Concrete Foundations
3.1.3.1
Structure Foundation Installation
Each column shall be bolted to a concrete foundation by at least four bolts
spaced to transmit structure stresses to the foundation. Diameters and
lengths of foundation bolts shall be as recommended by the structure
manufacturer. Bolts shall be embedded in concrete in a manner to develop
their full strength. Anchor bolts shall be accurately set in foundations
SECTION 16311A