NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70
(2005) National Electrical Code
NFPA 90A
and Ventilating Systems
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA HVAC Duct Const Stds
(1995, 2nd Ed) HVAC Duct Construction
Standards - Metal and Flexible
SMACNA HVACTAB
(2002, 3rd Ed) HVAC Systems - Testing,
Adjusting and Balancing
FCC Part 15
UNDERWRITERS LABORATORIES (UL)
UL 508
(1999; Rev thru Dec 2003) Industrial
Control Equipment
UL 555S
(1999; Rev thru Apr 2003) Smoke Dampers
UL 916
(1998; Rev thru Feb 2004) Energy
Management Equipment
1.2
SUBCONTRACTOR SPECIAL REQUIREMENTS
Perform all work in this section in accordance with the paragraph entitled
"Subcontractor Special Requirements" in Section 01310 ADMINISTRATIVE
REQUIREMENTS. The paragraph specifies that all contract requirements of
this section shall be accomplished directly by a first tier subcontractor.
No work required shall be accomplished by a second tier subcontractor.
1.3
SYSTEM DESCRIPTION
Provide [new and modify existing] space temperature control systems
complete and ready for operation.
1.4
SYSTEM REQUIREMENTS
**************************************************************************
devices must be of a particular type for reasons of
safety, control accuracy, or other technical reasons.
**************************************************************************
electronic or pneumatic devices. Indicated control system devices of a
particular type do not intend a requirement for the device unless the
requirement is specifically indicated. Requirements apply to field
installed control systems.
**************************************************************************
NOTE: Regarding the text below, indicate the
SECTION 15901N
Page 9