field representative(s) shall certify in writing to the Contracting Officer
that dust collector(s) [has] [have] been installed as recommended by the
manufacturer. The field representative(s) shall supervise the adjustment
of all controls, control devices, and components supplied with dust
collector(s) as necessary to place dust collector(s) in successful
operation. Field representative(s) shall instruct plant operators in
operation, care, and maintenance of the dust collector(s). Written notice
from the Contracting Officer shall be received prior to scheduling these
instructions. The field representative[s] services will be required for
approximately [3] [_____] days and will include [2] [_____] round trips to
the job site.
1.7
RELATED REQUIREMENTS
Section 15050N BASIC MECHANICAL MATERIALS AND METHODS, shall apply.
1.8
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SECTION 15861N