(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
**************************************************************************
NOTE: Delete items in brackets when fiberglass duct
is not used.
**************************************************************************
SD-01 Preconstruction Submittals
Diffusers, registers, and grilles
[
Duct hangers and supports]
Submit a schedule of inlets and outlets indicating location,
catalog model number, manufacturer, dimensional information, sound
pressure level rating, nominal rated volumetric flow rate liter
per second (L/s) cfm, neck or face velocity at specified L/s cfm,
pressure drop at specified L/scfm, throw and drop for outlets,
range for diffusers, and maximum and minimum L/s cfm modulation.
SD-02 Shop Drawings
Locations of test holes
[
Duct hangers and supports details]
[
Fibrous glass ducts fabrication and reinforcement details]
SD-03 Product Data
Dampers
Fire dampers
Automatic Smoke-Fire Dampers
Automatic smoke dampers
Sound attenuators
Acoustical duct lining