panel:
a.
Main power switch and indicating lamp
b.
MAN-OFF-AUTO selector switch
c.
Indicating lamp for bleed-off valve
d.
120 Volt, heavy-duty, grounded duplex receptacle
e.
Conductivity controller
f.
Electric timer
g.
Accumulative counter
2.11.9
Sequence of Operation
2.11.9.1
Conductivity Controller
cooling water rises above the set point of the controller. When the
conductivity falls below the set-point, the valve shall close.
2.11.9.2
Water Meter
Shall start the timer after a pre-set volume of make water has been
measured.
2.11.9.3
Timer
Shall turn the feed pumps on for a pre-set amount of time.
2.11.10
Piping
Provide plastic piping and fittings conforming to ASTM D 2996 for water
treatment system. Piping for feed pump suction shall contain a foot valve
and strainer.
2.11.11
Chemicals
**************************************************************************
NOTE: Select the applicable paragraphs from the
following:
**************************************************************************
[Provide sufficient chemicals to initially place system in service and make
tests.] [Provide same chemicals used for treatment at station's other
towers.]
2.11.11.1
Water Analysis
Description
Silica (Si02)
___________
Insoluble
___________
Iron and Aluminum Oxides
___________
Calcium (Ca)
___________
Magnesium (Mg)
___________
SECTION 15602N
Page 26